Technical review
Plans, dimensions, exploded views, junctions, installations, access and fitting conditions
We review drawings, outstanding decisions and site conditions before pricing. The aim is a scope that the workshop can manufacture and the site team can install without guesswork.
Send us the available documentation, location, units and target date
The scope can begin with a defined design or with a still open need. We confirm what documentation exists and what decisions are missing before manufacturing
Plans, dimensions, exploded views, junctions, installations, access and fitting conditions
We adjust construction solutions, thicknesses, machining and hardware to the intended use
Manufacturing according to documentation and finishes validated before starting
We plan delivery, access, fitting, adjustments and review of installed parts
The dialogue, level of detail and planning change depending on who coordinates the work and how the furniture must be delivered.
We turn the design intent into a solution that can be measured, manufactured and installed to the agreed detail
We integrate the custom carpentry into the renovation schedule and review the conditions before fitting
We organize typologies, units and phases to be able to value the furniture with a comparable and documented scope
We assess furniture projects for rooms and common areas based on frequent use, cleaning and maintenance.
We study commercial furniture that combines display, storage, brand image and real conditions of the premises
We propose solutions for homes intended for sale or rent according to the typology, use and planned investment.
Tell us who coordinates the work, what furniture you need and what documentation exists. We will review the case by scope, not by label
Each milestone reduces uncertainty and leaves a record of what is manufactured, how it is finished and under what conditions it is installed.
Plans, measurements, units, finishes, location and planned schedule
Technical queries, exclusions, alternatives and outstanding information
Final measurements, samples, hardware, details and fitting conditions
Manufacture, control, delivery, installation and agreed adjustments
It is not necessary for all documentation to be closed. We review what is available and point out exactly what information is missing to continue
What parts should be manufactured and if there are repeated typologies
Plan, elevations, details or approximate dimensions for a first review
Prescribed finishes or visual references to propose a viable equivalence
town or area, access routes, phase of work and target installation date
The final scope is confirmed after reviewing the documentation and actual project conditions
Yes. We review the documentation, detect manufacturing doubts and confirm details, materials, fittings, measurement and fitting before assessing the final scope
Yes, as long as it is defined what part of the development we assume. We can propose constructive solutions and materials compatible with the use and the planned investment.
Yes. We need to know typologies, quantities, location, delivery sequence, storage and installation conditions
Measurements, configuration, materials, finishes, fittings, relevant junctions, economic scope and transport and installation conditions
The useful part of an initial enquiry is not how polished it looks. It is whether it gives us enough truth about the room to ask the next, more focused question.
You do not need trade vocabulary. Tell us what gets left out, what feels awkward and what you reach for every day. Add current drawings, finish intent, programme dates and known access constraints, and the conversation has a solid place to begin.
For Moraira, we also ask whether the property is occupied, being refurbished or waiting for handover. The answer changes what can be checked now and what must wait.
Older walls are rarely perfect and recent renovations can hide their own surprises. The measured visit records the useful irregularities, not merely the largest number on each wall.
We distinguish a dimension used to explore an idea from one released to the workshop. That small discipline prevents an early estimate from quietly becoming a production instruction.
We compare samples, technical details, production information and installation responsibilities as a working combination. Colour is considered beside cleaning, load, moisture, touch and the amount of daylight in the room.
We may recommend spending more on runners or hinges and less on a fashionable outer surface. The choice depends on which part carries the daily work.
A beautiful elevation is not enough if it cannot enter the building or be adjusted safely. The fitting sequence is considered while the drawings can still respond.
Parking restrictions or a long carry do not automatically rule out the project. They do need an agreed plan, enough people and protection prepared before the parts arrive.
Where the budget needs discipline, we protect the parts that work hardest: sensible internals, reliable moving hardware and a layout that uses the room well. Decorative upgrades can remain choices.
The most expensive version is not automatically the most convincing. Proportion, alignment and a calm distribution often do more for the room than another decorative feature.
The aim of the first exchange is simple: give the project a sensible direction without manufacturing certainty that does not yet exist.
Once the direction is agreed, we can discuss timing with more honesty. Lead time follows the approved scope, material availability and conditions at the property.
Share plans, units, location and target date. We will tell you the next step